|
|
Barn Progress 2010 The barn is basically completed except for heating and air conditioning. It is completely insulated but still looks like the inside of the original structure. There are four bays in the upper level, a library, a children's discovery room, a full size kitchen in one of the granaries, and two modern bathrooms in the other granary. The south bay and the north bay each have floor to ceiling glass that isolates them from the center two bays. The two center bays, when available, can be used for public events. As soon as the climate control is installed, the storage rooms can be utilized downstairs and permanent exhibits can be installed upstairs.
|