Greencastle, PA
Home Back Topsoil Blast Excavating Footers Poured Walls Stonework 1 Stonework 2
July 28, 2005 The Foundation BLAST! 40 to 50 loads of fill are hauled in to buffer the foundation blast.
About 340 holes are drilled into the bedrock. The explosives are set and connected.
Video of the blast (WMV Format, 360Kb, 30 sec) top